Embed
Embed the Sprint Velocity Calculator (Agile)
Three quick steps — customize the look, choose how it behaves, then copy the code onto your site.
Already have an account? Sign in
Live preview
01,000
01,000
01,000
01,000,000
Sprints Needed to Clear Backlog
6
Estimated number of sprints needed at the current average velocity
Average Velocity (points/sprint)
20.0
Average story points completed per sprint
Share result
Reload calculator
Clear inputs
Found this calculator useful?