Calcupedia

Embed

Embed the Earned Value Management (EVM) Calculator

Three quick steps — customize the look, choose how it behaves, then copy the code onto your site.

Your reference only — not shown to visitors

Shown to visitors above the calculator, in every display mode. Leave blank for none.

Optional supporting text shown just below the heading.

Colors the calculator's own section bars and highlights — the whole calculator's look, not just the results panel.

#FF5C00
#FFFFFF
#0A0C0B
12px

Remove "Powered by Calcupedia"

Available on Creator plan →
#FF5C00
#FFFFFF

Already have an account? Sign in

Live preview

USD
$0.00$10,000,000.00
%
0%100%
%
0%100%
USD
$0.00$10,000,000.00
USD
$0.00$10,000,000.00
%
0%100%
%
0%100%
USD
$0.00$10,000,000.00
USD
$0.00$10,000,000.00
%
0%100%
%
0%100%
USD
$0.00$10,000,000.00

Earned Value (EV)

$1,275.00

The budgeted value of the work actually completed

USD

Planned Value (PV)

$1,475.00

The value of work that was scheduled to be done by now

Actual Cost (AC)

$1,700.00

What has actually been spent so far

Cost Performance Index (CPI)

0.750

Above 1 means under budget, below 1 means over budget

Schedule Performance Index (SPI)

0.864

Above 1 means ahead of schedule, below 1 means behind schedule

Share result
Reload calculator
Clear inputs

Found this calculator useful?

Powered by Calcupedia